This paves the way for setting up additional infrastructure facilities at the port concessionaire AVPPL with an investment to the tune of around ₹10,000 crore. The container terminal will be expanded to 1,200 m in length, and the length of the breakwater will be increased by another 900 m.
Related Posts
Peenya flyover in north Bengaluru set to reopen for heavy vehicles after three-year delay, but conditions apply
However, commuters will continue to face inconvenience on weekends due to ongoing special repair work on the elevated flyover. As a result, heavy motor vehicles

Waiting time for free darshan at Tirumala shoots up to 30 hours
Queue lines stretch out to a couple of kilometres, VIP darshan cancelled on three days of weekend till June 30

Lok Sabha results and voting trends
This interactive feature looks at election results in the previous two Lok Sabha elections (2014 and 2019), which can be filtered down further using several